CRANE PLANNING · RIGGING DESIGN · JOBSITE VISUALIZATION

Every lift starts
with a clear plan.

3D Crane Studio brings crane setup, jobsite layout and rigging design into one workspace so the crew can see the move, review the details and brief the lift together.

Watch the introduction · 13 min
3D Crane Studio illustration of crawler cranes and a turbine lift at a power plant
Visualize the jobsiteBuild the riggingReview the load pathPrepare the crew briefing

Your workspace, above and below the hook

Plan the crane and jobsite, then work through the rigging below the hook.

3D Crane Studio

Lay out the crane, load and jobsite in one 3D view. Walk through the move from pick to set and document the planned configuration.

  • Crane setup and lift geometry
  • Jobsite layout and simulation
  • Ground bearing and critical lift worksheet
Open 3D Crane Studio

3D Rigging Studio

Build a load assembly, lay out pick points and visualize how the slings, spreaders and hardware connect.

  • 3D load builder and rigging view
  • Sling force estimates for supported configurations
  • Spreader and rigging hardware libraries
Open Rigging Studio

From layout to pre-lift briefing

A shared plan gives the operator, riggers and lift director a common view of the job and makes open questions easier to spot.

  1. Lay out the lift

    Record the crane configuration, load dimensions, weight and center of gravity. Place the crane and mark the pick and set locations.

  2. Walk the load path

    Use the 3D view to discuss swing, clearances and nearby equipment. Resolve layout conflicts before they become field changes.

  3. Brief the crew

    Use the same view and worksheet to review the sequence, crew roles, communication and when to stop and reassess.

Why a lift plan matters for safety

A plan puts the information the crew needs to verify in one place. Reviewing it before the lift gives the team time to resolve missing information or changed site conditions before hoisting.

OSHA crane and derrick standards

Verify before hoisting

  • Load weight, center of gravity, rigging and pick points
  • Manufacturer load chart for the actual crane configuration and working radius
  • Ground support, obstructions, power lines and the fall zone
  • Weather limits, crew roles, communications and stop criteria

Use 3D Crane Studio for planning and visualization. Verify capacity against the applicable manufacturer load chart and follow the required site procedures and qualified review before lifting.